Compute North – RFP to Provide Physical Power Supply – Any Location

Published:February 2, 2022

The below RFP information is posted on behalf of Compute North.

Background

Compute North is meeting the growing demand for scalable, cost-effective digital infrastructure solutions for highly specialized computing needs. Driven by trusted leaders with deep experience in data centers, technology, and energy; the company is redefining how services are delivered for blockchain cryptocurrency, and other distributed computing applications. With a consistent yet interruptible load profile, Compute North works collaboratively with power providers in support of developing an intelligent grid that relieves congestion, promotes renewables, and strengthens the stability of local power markets.

Compute North owns and operates state-of-the-art TIER 0™ data centers strategically located throughout the U.S. and around the world, specifically designed to make the most of blockchain technology. We pioneered the TIER 0™ concept to serve as a next-generation solution for optimized
distributed computing. Our facilities have been strategically built to scale quickly and operate cost-efficiently, a unique departure from the traditional data center model, allowing our users to scale their operations in a fraction of the time. Backed by a mix of energy sources, cost-competitive infrastructure, and our hands-on expertise, we are helping users maximize their capability in compute intensive applications such as cryptocurrency mining, blockchain, machine learning, and more.

Compute North’s TIER 0™ data centers offer an extremely high load factor – in excess of 95%, and provide opportunities for local utilities and RTO markets to take advantage of our operational flexibility by curtailing up to 100% of our facilities’ load for 200-300 hours per year. Due to our operational flexibility, when sized correctly, our TIER 0™ data centers will help utilities and RTO markets raise their system load factors, while not requiring any additional capacity in order to facilitate our operations. In addition, our TIER 0™ data centers will help to provide an economic boost to the local communities in which we partner with through increased tax revenues and new job opportunities at our facilities.

For more information about our company and facilities, please visit:  https://www.computenorth.com/

Request Details

Compute North is seeking proposals to provide physical power supply at future Compute North TIER 0™ data center sites (to be developed at the utility host site).

Proposals should include both site location options along with power supply details. Compute North will consider virtually any location in the United States, and the intent is for Compute North to bring and build our TIER 0™ data centers to your site and electrical transmission/distribution system infrastructure.

Project Scope

Compute North is seeking site and power supply options for a minimum of 10 MW, and will consider any size proposals for sites and power supply up to 1,000 MW. When considering potential sites, please keep in mind that our TIER 0™ data center sites require approximately 1 acre of surface land area for every 10 MW of site load demand.

Click on the below RFP document for details.